Celebratory Milestones#

Provenance#

This document was generated based on the contents of the lsst-dm/milestones repository, version 0b5c4af9, dated 2024-03-23. This corresponds to the status recorded in the project controls system for January 2024. This compares to December 2023.

Top milestones#

Code

Name

Due

Previously

EPOC285

EPO Construction Finish

2022-09-30

Completed

T&SC-0400-1730

TMA Handoff to Rubin

2023-03-31

Completed

CAMM8090

COMP: Camera Pre-Ship Review at SLAC

2024-04-25

2024-03-26

SUMMIT-Oct24-160

ComCam Reinstalled on TMA

2024-06-26

2024-06-17

T&SC-1100-0400

3-Mirror Optical System Ready for Testing

2024-07-05

2024-07-22

COMC-060200-20930

Camera Ready for Full System AI&T

2024-10-08

2024-09-17

T&SC-0400-0950

Dome Complete

2024-12-16

2024-12-16

SITCOM-122

LSSTCam Ready for On Sky (First Photon)

2025-01-14

2025-02-19

LSST-1520

System First Light with LSSTCam

2025-02-27

2025-04-04

LDM-503-17a

Test report: Final Pipelines Delivery

2025-06-25

2025-07-31

COMC-0654-0430

COMP: Science Validation Surveys Complete

2025-06-25

2025-07-31

SITCOM-130

Operation Readiness Review Complete

2025-07-02

2025-08-07

A public HTML version for embedding is here.

Supporting milestones#

Code

Name

Due

Previously

LDM-503-11a

ComCam Ops Readiness

2020-12-31

Completed

EPO-M6

User Interfaces Complete

2022-09-30

Completed

EPOC304

Citizen Science Commissioning Project running via LSST infrastructure Complete

2022-09-30

Completed

SITCOM-92

Camera support asmy w/ComCam+PF+Int#1+CCW Installed on Telescope

2022-12-01

Completed

LDM-503-13

Ops rehearsal for data release processing #1

2023-02-28

Completed

DM-27734

Completion of the Scheduler

2023-06-30

Completed

SITCOM-127

M2 coating decision

2023-10-01

Completed

LSST4820

Love Contract Complete

2023-11-01

Completed

DM-35987

OCS Available on Summit

2024-02-01

2024-01-02

DM-35989

TCS Demonstrated

2024-02-01

2024-01-02

SITCOM-102

TMA safe for transition to M1M3 glass mirror

2024-02-01

2024-01-02

SITCOM-97

M1M3 cell+Surrogate Dynamic Testing on TMA done

2024-02-01

2024-02-05

SITCOM-105

ComCam + PF re-Installed on TMA

2024-02-02

2024-01-03

SUMMIT-2976

LSSTCam Received @ Summit

2024-05-15

2024-04-23

SITCOM-104

M2 Glass installed on Cell

2024-05-15

2024-05-23

DM-35988

M2 Software demonstrated

2024-06-03

2024-05-02

SITCOM-109

M1M3 Mirror Coating completed

2024-06-07

2024-06-24

T&SC-1100-0300

M2 Installed on Telescope

2024-06-20

2024-06-11

SITCOM-110

M1M3 installed on the TMA

2024-07-05

2024-07-22

SITCOM-125

LSSTCam reverification complete

2024-10-08

2024-09-17

SITCOM-123

LSSTCam Installed on TMA

2024-11-20

2025-01-29

New1135

LSSTCam Cold

2025-01-07

2025-02-12

SUMMIT-3023

COMP: TMA Refrigeration Tests Complete

2025-01-29

2025-01-29

New1110

Full focal plane readout complete

2025-01-30

2025-03-07

New1165

Telescope Aligned

2025-01-31

2025-03-10

DM-AP-17

Solar System Processing pipeline (SSP) available.

2025-02-27

2025-04-04

SITCOM-116

Initial Optical testing on TMA complete

2025-02-27

2025-04-04

SITCOM-121

System First Light with LSSTCam

2025-02-27

2025-04-04

COMC-0140

Start SV Data Collection

2025-04-04

2025-05-12

DM-AP-16

Full integration of the Alert Production system within the operational environment.

2025-06-25

2025-07-31

LDM-503-16

Ops rehearsal for data processing #3

2025-07-02

2025-08-07

Block Schedule

Download the PDF of this Block Schedule here.

Acronym

Description

AI

Artificial Intelligence

AI&T

Assembly Integration & Test

AP

Alert Production

CCW

Camera Cable Wrap

COMP

COMPlete

ComCam

The commissioning camera is a single-raft, 9-CCD camera that will be installed in LSST during commissioning, before the final camera is ready.

DM

Data Management

EPO

Education and Public Outreach

HTML

HyperText Markup Language

LDM

LSST Data Management (Document Handle)

LSST

Legacy Survey of Space and Time (formerly Large Synoptic Survey Telescope)

M1M3

Primary Mirror Tertiary Mirror

M2

Secondary Mirror

OCS

Observatory Control System

PDF

Portable Document Format

SC

System Commissioning

SITCOM

System Integration, Test and Commissioning

SLAC

SLAC National Accelerator Laboratory

SSP

Solar System Processing

SV

Science Validation

TCS

Telescope Control System

TMA

Telescope Mount Assembly